Kippax was built for the pit and most of the village is post-war semis that have passed from the council into private hands. They were rewired once, in the 1960s or 70s and the boards from that job are often still in the cupboard under the stairs, with rewireable fuses and no RCD protection at all. It is the single most common thing we find on a Kippax EICR. A modern consumer unit cuts the power in a fraction of a second when something goes wrong, which is what stands between a fault and a fire.
We are next door in Garforth, so a Kippax board change is an easy day. We test every circuit before the changeover, fit a metal board with surge protection as standard, label every circuit properly and hand over the paperwork the same day. The power is off for a few hours in the middle of the day and back on by the afternoon. Across Leeds a consumer unit upgrade is typically £400 to £750 depending on the number of circuits and we fix your price before we start.
Minutes from Garforth
Your local electricians, so the survey, the job and anything afterwards are all a short drive.
Tested before we swap
Every circuit is checked first, so a hidden fault turns up before the new board goes on.
RCD on every circuit
A metal board with surge protection and RCD cover throughout, labelled so anyone can read it.
Your questions, answered
How do I know my ex-council semi needs a new board?
If it has rewireable fuses, a wooden back board, no test button or it has never been changed since the house was rewired, it is due. A quick look tells us for certain.
Does the upgrade include RCD protection?
Yes, on every circuit. That is the point of the upgrade. Older boards protected the cables. A modern board protects you.
How disruptive is the work?
One day, with the power off for a few hours in the middle. We tell you when beforehand so you can plan around it.
Ready for electrics done properly?
Free fixed quotes across Leeds and West Yorkshire. Careful work, an immaculate finish and a price that doesn't move.
